All trades

Demolition Contractor Report

Demolition contractors

Record voice notes in Telegram/WhatsApp

I'm at City Exchange with Sophie Martin from City Healthcare, 15:00.

Called out because soft strip prior to demo.

I've checked the safety measures, Demolition sequencing, Materials for salvage.

Found suspect ACM in ceiling tiles and mixed waste noted; segregated materials and taped area.

Put in a temporary fix for now; we'll firm it up once the quote is approved.

Sophie to keep an eye on the safety measures over the next week and let me know if anything changes.

I'll send a quote for asbestos survey before strip, lockable skip for segregated waste.

For today, invoice is call-out plus 1 hour labour; Dust sheets and tape used for temporary protection.

Instantly get a professional PDF or sharable link to the report.

Need changes? Ask for an update.

Reply with edits and we update the same report—no need to regenerate. You'll get the refreshed PDF and share link back within seconds.

Ready to create professional reports like these?

Start Free Trial

Start with £5 free credit. No card required.

View other trade examples

Browse all 80+ trades →