Record voice notes in Telegram/WhatsApp
I'm at Maple Works with Sarah Patel from Greenline Property, 09:45.
Called out because RCD nuisance tripping on ring final.
I've checked the consumer unit / distribution board, Circuits and wiring, Sockets and switches.
Found loose neutral in consumer unit and cracked double socket; re-terminated neutral and isolated damaged socket.
Put in a temporary fix for now; we'll firm it up once the quote is approved.
Sarah to keep an eye on the consumer unit / distribution board over the next week and let me know if anything changes.
I'll send a quote for replacement RCBO for ring circuit, new twin sockets to replace damaged accessories.
For today, invoice is call-out plus 1 hour labour; Wago connectors used to make temporary safe joint.
Instantly get a professional PDF or sharable link to the report.
Need changes? Ask for an update.
Reply with edits and we update the same report—no need to regenerate. You'll get the refreshed PDF and share link back within seconds.
Ready to create professional reports like these?
Start Free TrialStart with £5 free credit. No card required.